FIRST TEAM MEETING
Meeting duration: 10 minutes
Date 22 september 2016 All members present We had our fist meeting today as Greed Cinema to check where everyone was on meeting the deadline. Grace is in charge of the horror genre page but I will assist her with creating the Power point for the iconic movies. Noah has started our concept poster and is also going to be changing our company logo. Tuan will be uploading the textual analysis tomorrow. So far everyone is up to date on their task. |
MEETING 2Meeting duration: 1 hour
Date: 27 september 2016 all members present we spent most of the lesson discussing ideas for our horror, what the genre should be, what the storyline is and the charcaters invovled. We have two main ideas that we are yet to decide upon. One is about a solider suffering from ptsd who goes on a killing spree and the other is about a group of teenagers who are haunted at a sleepover by an old friend. |
MEETING 3 (PRE PRODUCTION)
Meeting duration: 5 minutes
Date: 29 september 2016 All members present We have completed our development stage, but we will still have to go back to make some changes to it. We are now focusing on our new task, the pre production stage. Grace is in charge of the audience research, meaning she will be creating a questionnaire to ask 30 people, she is considering using survey monkey for her research. Noah is in charge of print design, he will be creating the templates for our horror poster and magazine front page. I will be creating a storyboard and animatics for our trailer, I will have to watch a lot of trailers to get my inspiration and to create a template out of. Lastly Tuan will be creating mood boards on photo shop on things like the protagonist, mise en scene and themes. |
MEETING 4 (PRE PRODUCTION)
Meeting duration: 5 minutes
Date: 6th October 2016 2 members present : Grace and Koinsola We are still working on our pre production stage. Grace is almost done with her questions and finding visual support for her questionnaire. I have started with the storyboard and found the template I will be using to help me set the pace (Smiley) , we hope to have all this finished by Monday so we can move on to the next stage, for Grace it will be asking people to fill the questionnaire and for me it will be starting the animatics. |
MEETING 5 (FINALISING PRE-PRODUCTION)
Meeting duration: 8 minutes
Date: 14th October 2016 All members present (done over WhatsApp) Today is the deadline for our pre production stage and we had quick meeting to know where everyone is and if anything needs to improved. Tuan has completed and uploaded all his mood boards with annotations, Grace has also completed all her audience research and has evidence and results to back it up. I have also completed my storyboard animatics task, and have uploaded them to our site. Noah is also almost finished all he has to do is upload his drawn draft which will be done before 12am, so we are all on track with our task. |
MEETING 6 (PRODUCTION STAGE)
Meeting duration: 5 minutes
Date: 1 November 2016 All members present We are moving onto the production stage, where we start planning for the actual shooting of the trailer. As usual we all chose a task to focus on. I chose Location Reece and Shooting Script, which means I would be building up from my previous task of animatics and arranging the script in order of location, to make shooting the trailer easier. Tuan is in charge of camera work, which means he would be working with Miss Alam to practice using the camera and equipment. Grace is in charge of costume and makeup, she needs to watch tutorials and thinking of costumes for the characters. Lastly Noah is in charge of sound design, his job is to add sound effects to our the animatics to help him prepare for when we actually start editing the trailer. |
MEETING 7 (PRODUCTION STAGE)
Meeting duration: 10 minutes
Date : 10 November 2016 3 members present: Grace, Koinsola and Noah We have been given our location for shooting; The Lewisham Art House and the group we will be working with. We are going to be working with The Little Black Box, which consist of Mariama, Nafisah, Sangwani and Tommy. We haven't met them yet but are planning to meet them before shooting day to get an understanding of what they want to do before the day so we can be plan ahead so shooting can go smoothly. As a group we have started discussing who we would like to cast as our protagonist and our antagonist but we need to still finalize it with the our partner group. |
MEETING 8 (PRODUCTION STAGE)
Meeting duration: 6 minutes
Date: 17 November 2016 All members present We are still working on our individual task. and have found a location that will work well with our trailer, which is Nunhead Cemetery. We have met with The Little Black Box and have discussed if they need anything from us: they need Tuan from our group and we need Tommy to play the antagonist and Mariama to play a protagonist from their group. |
MEETING 9
Date: 21 november 2016
All members present
We have created a pre shoot v-log to discuss our plans before we shoot our trailer; like where we will be filming, who we are going to work with and our expectations for the shoot
All members present
We have created a pre shoot v-log to discuss our plans before we shoot our trailer; like where we will be filming, who we are going to work with and our expectations for the shoot
MEETING 10 (POST SHOOTING)
Meeting duration: 5 minutes
Date: 24 November 2016 All members present We did our shooting yesterday with the other group and it was a success. We got some really good shots and worked well with the other group and made the most of our time. We didn't get to do every shot because the ground at the cemetery was wet, which we didn't anticipate so, people weren't comfortable being dragged across the wet ground which is understandable. |
MEETING 11
Date: 28 november 2016
All members present
In this v-log we are just discussing our experience during filming and what needs to be done to complete our task.
All members present
In this v-log we are just discussing our experience during filming and what needs to be done to complete our task.
MEETING 12
Meeting duration: 20 minutes
Date: 1 December 2016 All members present We have got our footage back and have sorted it out into Keep, Maybe and Delete, this way there is less stress when I start editting our work. and are just making sure everything we need before we start editing and creating the magazines and poster is done. We still need some pictures for our magazine and posters, which Tuan is going to take. |
MEETING 13
Meeting Duration: 10 minutes
Date: 8 December 2016 Members present: Koinsola, Grace, Noah We are all working on our individual task: Tuan is working on the magazine, Grace was supposed to working on the poster but since Noah worked on the print design, he's taken over the task, which means Grace will have to assist me with editing. |
MEETING 14
Meeting Duration: 5 minutes
Date: 15 December 2016 All members present We are a day away from our deadline and almost done with all our task, the magazine and poster are done, but the editing still needs a bit of work and also we might have to create a new sound animatic because the we have now doesn't really match the trailer. |